RIG 03
INDUSTRIAL TESTING
( Simulated Industrial Environment Practice Rig )
Initial Verification
Periodic Inspection & Testing
Reporting & Certification
Fault Finding (12 X Switchable Faults)

RIG DESIGN SPECIFICATIONS:

(ALL CIRCUITS HAVE BEEN DESIGNED AND INSTALLED TO GIVE 'REAL WORLD' TEST READINGS & ALL CABLE CPC'S AT OUTLETS/CONSUMER UNITS ARE 'REAL WORLD SIZE')

Three phase.

12  individual circuits to test.

Three phase factory distribution board to test including RCBO & MCB devices.

Gas & water earth bonding test points.

12 switchable, introducable faults.

Design can be changed to suit your requirements.

Lockable incoming mains supply, emergency cut off switch and green indicator light when board is live. 

The Rig is supplied mounted on a stand alone board, other mounting options available.

Supplied with NICEIC certificate and is fully compliant with awarding bodies requirements and the latest BS7671 regulations.

Can be supplied within 7 days.

©   2025   •  Midlands Electrical  Test Rigs •  All Rights Reserved.

We need your consent to load the translations

We use a third-party service to translate the website content that may collect data about your activity. Please review the details in the privacy policy and accept the service to view the translations.